Planmere Studio / Planning guide
How to compare kitchen quotations.
The cheapest headline figure may cover a different kitchen. Put each quotation against one agreed plan and schedule before comparing totals.
Give every supplier the same starting point
Share the same revision of your layout, cabinet schedule, appliance list and finish brief. State whether worktops, delivery and installation should be included. If a supplier needs to alter a cabinet size or product, ask for that change in writing so it can be reviewed against the layout.
A worked example: the missing items matter
The figures below are fictional and assume the same specification and VAT basis. They illustrate comparison only; they are not a price guide for your kitchen.
| Item | Quote A | Quote B |
|---|---|---|
| Headline quotation | £9,800 | £10,200 |
| Required delivery | £250 extra | Included |
| Required matching end panels | £400 extra | Included |
| Comparable total | £10,450 | £10,200 |
Quote A initially appears £400 cheaper. After those two known omissions, Quote B is £250 cheaper for this example’s scope. This comparison would still be incomplete if the cabinet construction, appliance models, worktop specification or service differed.
Check more than the cabinet count
- Cabinetry: unit references, dimensions, fronts, internal fittings and drawer systems.
- Finishing items: fillers, decorative panels, plinths, handles and any trim.
- Worktops: material, thickness, edges, joints, cut-outs, templating and fitting.
- Appliances: exact model references, quantities and responsibility for supply.
- Delivery: charges, access assumptions, storage requirements and damage reporting.
- Installation: the work included, who performs it and what is excluded.
- Related work: removal, waste, plumbing, electrics, plastering, flooring and making good where relevant.
Record unknowns instead of treating them as zero
If an item is described as provisional, ask what the allowance covers, what could change it and when a firmer price will be available. If something is missing, request a written clarification. Do not fill the gap with an assumed low figure just to complete a spreadsheet.
Keep a short comparison sheet with four columns: item, supplier A, supplier B and question still to resolve. This makes open decisions visible and gives you a record to revisit when a revised quote arrives.
Compare responsibility and support
Price is one part of the decision. Confirm who measures the room, approves ordering drawings, checks compatibility, handles shortages and responds to problems. Ask about payment stages, delivery expectations and the written terms before committing. A clear allocation of responsibility is more useful than a general promise that everything is covered.
Use one final design revision
When a layout changes, update the plan and schedule together and ask each supplier to reprice the same issue. Planmere’s independent kitchen design service provides an agreed design reference; your supplier must still translate it into its own exact product and ordering system and complete its checks.
Apply this to your room
Explore the demonstration packs, prepare your measurements or request a phone call. We agree the scope and fee before any design booking.